McDATA Sphereon 4300 User Manual

Browse online or download User Manual for Network switches McDATA Sphereon 4300. Sphereon 4300 Fabric Switch Installation and Service Manual

  • Download
  • Add to my manuals
  • Print
  • Page
    / 188
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews

Summary of Contents

Page 1 - Sphereon™ 4300 Fabric Switch

McDATA®Sphereon™ 4300 Fabric SwitchInstallation and Service ManualP/N 620-000171-030REV A

Page 2 - Revision Date Description

xMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualTables

Page 3 - Contents

3-36McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures• Event code 142 - OpenTrunking firmware detected

Page 4 - Chapter 4 Repair Information

Maintenance Analysis Procedures3-37Maintenence Analysis Procedures23A zone merge process failed during ISL initialization. The following list explains

Page 5 - Appendix A Event Code Tables

3-38McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis ProceduresObtain supplementary error code data for event co

Page 6

Repair Information4-14Repair InformationThis chapter describes repair-related procedures for the Sphereon 4300 Fabric Switch. The procedures are perfo

Page 7

4-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationPower On SwitchTo power on the switch:1. An alternating current

Page 8

Repair Information4-3Repair InformationPower Off SwitchTo power off the switch:1. Inform the customer the switch is to be powered off. Ensure the syst

Page 9

4-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationIMLTo IML the switch:1. Press and hold the IML/RESET button (ab

Page 10

Repair Information4-5Repair InformationCAUTIONWear eye protection when using an aerosol duster.To clean fiber-optic components:1. Optical transceivers

Page 11

4-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationDownload Firmware from the FilecenterThe firmware version shipp

Page 12

Repair Information4-7Repair Information4. Select (click) Documents at the top of the page. The Search / New Documents / By Category page displays.5. S

Page 13

PrefacexiPrefaceThis publication is part of a documentation suite that supports the McDATA® Sphereon 4300 Fabric Switch.Who Should Use thisManualUse t

Page 14

4-8McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationPort LED DiagnosticsFibre Channel port diagnostic information i

Page 15

Repair Information4-9Repair InformationRepair Procedures - EFCM Basic EditionThe following procedures (performed at a PC communicating with the EFCM B

Page 16

4-10McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationEvent Log The Event Log records events or errors. Entries refl

Page 17

Repair Information4-11Repair Information• Old Exit Port - Port number (decimal) transmitting Fibre Channel traffic before the re-route.• New Exit Port

Page 18

4-12McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationPerform Port DiagnosticsFibre Channel port diagnostic informat

Page 19

Repair Information4-13Repair Information• Operational State - Port state (Online, Offline, Not Installed, Inactive, Invalid Attachment, Link Reset, No

Page 20

4-14McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair Information• FAN Configuration - User-configured state for fabric address

Page 21

Repair Information4-15Repair Information• Media - Type of optical cable used (Singlemode, multimode 50-micron, multimode 62.5-micron, or Unknown).• Sp

Page 22

4-16McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair Information2. At the EFCM Basic Edition interface, select Ports and Diagn

Page 23 - Switch Description

Repair Information4-17Repair Informationb. For the tested port, click (enable) the check box in the Reset column. A check mark in the box indicates th

Page 24 - Field-Replaceable

xiiMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualPrefaceChapter 4, Repair Information - This chapter describes supplementary diagn

Page 25 - SFP Transceiver

4-18McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair Information10. Reset the tested port:a. Select Ports and Reset from the M

Page 26 - IML/RESET Button

Repair Information4-19Repair Information2. Right-click the Data Collection link to open a list of menu options. Select the Save Target As menu option.

Page 27 - FRU Status LEDs

4-20McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationFigure 4-6 Switch View2. Perform one of the following:— If the

Page 28 - Switch Specifications

Repair Information4-21Repair InformationFigure 4-7 Basic Information View2. Perform one of the following:— Click the check box for the selected port i

Page 29 - Maintenance Approach

4-22McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationDetermine Firmware VersionTo determine a firmware version, sel

Page 30 - Switch Management

Repair Information4-23Repair Information2. At the Download Firmware file from field, select the desired file from the PC hard drive using the Browse b

Page 31 - Tools and Test Equipment

4-24McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair InformationBack UpConfigurationTo back up the switch configuration file t

Page 32 - Tools Supplied with

Repair Information4-25Repair InformationFigure 4-10 Restore Configuration View4. At the Download Configuration file from field, select the desired fil

Page 33 - Service Personnel

4-26McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRepair Information6. The switch IP address resets to the default address of 10.1

Page 34

Removal and Replacement Procedures5-15Removal andReplacement ProceduresThis chapter describes field-replaceable unit (FRU) removal and replacement pro

Page 35

PrefacexiiiPrefaceWhere to Get Help For technical support, contact the McDATA solution center. The center provides a point of contact for assistance a

Page 36 - Summary of Installation Tasks

5-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRemoval and Replacement ProceduresESD ProceduresFollow these ESD procedures:• If

Page 37 - Unpack and Inspect

Removal and Replacement Procedures5-3Removal and Replacement ProceduresRRP 1: SFP Optical TransceiverUse the following procedures to remove or replace

Page 38 - Desktop Installation

5-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRemoval and Replacement Procedures6. Disconnect the fiber-optic jumper cable from

Page 39 - Installation

Removal and Replacement Procedures5-5Removal and Replacement Procedures4. Perform an external loopback test. Refer to External Loopback Test for instr

Page 40 - Installation Tasks

5-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualRemoval and Replacement Procedures

Page 41

Illustrated Parts Breakdown6-16Illustrated PartsBreakdownThis chapter provides an illustrated parts breakdown for Sphereon 4300 Switch field-replaceab

Page 42 - Configure Date and

6-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualIllustrated Parts BreakdownFront-Accessible FRUsFigure 6-1 illustrates front-acce

Page 43 - Parameters

Illustrated Parts Breakdown6-3Illustrated Parts BreakdownMiscellaneous PartsFigure 6-2 illustrates miscellaneous parts. Table 6-2 is the associated pa

Page 44

6-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualIllustrated Parts BreakdownPower Cords and ReceptaclesFigure 6-3 illustrates opti

Page 45

Illustrated Parts Breakdown6-5Illustrated Parts BreakdownTable 6-3 Power Cord and Receptacle ListRef. Part Number Description Feature-1 806-000001-000

Page 46 - Configure Network

xivMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualPrefaceLaser ComplianceStatementProduct laser transceivers are tested and certifi

Page 47 - Network View

6-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualIllustrated Parts Breakdown-12 806-000040-000 Power cord, AC, United States (Chic

Page 48 - Configure Basic Port

Event Code TablesA-1AEvent Code TablesAn event is a state change, problem detection, or problem correction that requires attention or should be report

Page 49 - BB_Credit

A-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code Tables— 0 - informational.— 2 - minor.— 3 - major.— 4 - severe (not op

Page 50 - Configure SNMP

Event Code TablesA-3Event Code TablesEvent Code: 021Message: Name Server database invalid.Severity: Minor.Explanation: Following an IML or firmware do

Page 51 - Enable CLI

A-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 051Message: Management Server database invalid.Sever

Page 52 - Host Control

Event Code TablesA-5Event Code TablesEvent Code: 062Message: Maximum interswitch hop count exceeded.Severity: Informational.Explanation: Fabric contro

Page 53 - Encryption

A-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 064Message: ESS response from indicated domain ID no

Page 54 - (Optional)

Event Code TablesA-7Event Code TablesEvent Code: 070Message: E_Port is segmented.Severity: Informational.Explanation: An E_Port recognized an incompat

Page 55

A-8McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 071Message: Switch is isolated.Severity: Information

Page 56 - D(installed) or

Event Code TablesA-9Event Code TablesEvent Code: 072Message: E_Port connected to unsupported switch.Severity: Informational.Explanation: The switch is

Page 57

PrefacexvPrefaceInternational SafetyConformityDeclaration (CBScheme)A certification bodies (CB) test report supporting a product indicates safety comp

Page 58

A-10McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 074Message: ILS frame delivery error threshold exce

Page 59

Event Code TablesA-11Event Code TablesEvent Code: 080Message: Unauthorized worldwide name.Severity: Informational.Explanation: The WWN of the connecte

Page 60

A-12McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 081Message: Invalid attachment.Severity: Informatio

Page 61

Event Code TablesA-13Event Code TablesEvent Code: 081 (continued)Event Data (continued):A = Unauthorized port binding WWN - The device WWN or nickname

Page 62

A-14McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 082Message: Port fenced.Severity: Informational.Exp

Page 63

Event Code TablesA-15Event Code TablesEvent Code: 083Message: Port set to inactive state.Severity: Informational.Explanation: A hardware or software p

Page 64

A-16McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 120Message: Error detected while processing system

Page 65

Event Code TablesA-17Event Code TablesEvent Code: 140Message: Congestion detected on an ISL.Severity: Informational.Explanation: OpenTrunking firmware

Page 66 - Quick Start

A-18McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 142Message: Low BB_Credit detected on an ISL.Severi

Page 67

Event Code TablesA-19Event Code TablesEvent Code: 150Message: Fabric merge failure.Severity: Informational.Explanation: During ISL initialization, the

Page 68

xviMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualPreface• Products conform with all protection requirements of EU directive 73/23/

Page 69 - MAP 0000: Start MAP

A-20McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 151Message: Fabric configuration failure.Severity:

Page 70

Event Code TablesA-21Event Code TablesFan Events (300 through 399)Event Code: 300Message: Cooling fan propeller failed.Severity: Major.Explanation: On

Page 71

A-22McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 302Message: Cooling fan propeller failed.Severity:

Page 72

Event Code TablesA-23Event Code TablesEvent Code: 311Message: Cooling fan propeller recovered.Severity: Informational.Explanation: Two cooling fans re

Page 73

A-24McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 370Message: Cooling fan status polling temporarily

Page 74 - Table 3-4 MAP 200 Event Codes

Event Code TablesA-25Event Code TablesCTP Card Events (400 through 499)Event Code: 400Message: Power-up diagnostics failure.Severity: Major.Explanatio

Page 75

A-26McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 411Message: Firmware fault.Severity: Major.Explanat

Page 76

Event Code TablesA-27Event Code TablesEvent Code: 421Message: Firmware download complete.Severity: Informational.Explanation: A new firmware version w

Page 77

A-28McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 426Message: Multiple ECC single-bit errors occurred

Page 78

Event Code TablesA-29Event Code TablesEvent Code: 440Message: Embedded port hardware failed.Severity: Major.Explanation: The embedded port hardware de

Page 79 - Table 3-6 MAP 400 Event Codes

PrefacexviiPrefacePeople’s Republic ofChina CCC MarkThe China Compulsory Certification mark (CCC mark) on a product indicates compliance with People’s

Page 80

A-30McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 445Message: ASIC detected a system anomaly.Severity

Page 81 - Table 3-7 MAP 500 Event Codes

Event Code TablesA-31Event Code TablesPort Events (500 through 599)Event Code: 506Message: Fibre Channel port failure.Severity: Major.Explanation: A F

Page 82

A-32McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 508Message: Fibre Channel port anomaly detected.Sev

Page 83

Event Code TablesA-33Event Code TablesEvent Code: 512Message: Optical transceiver nonfatal error.Severity: Minor.Explanation: Switch firmware detected

Page 84

A-34McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 514Message: Optical transceiver failure.Severity: M

Page 85

Event Code TablesA-35Event Code TablesEvent Code: 516Message: Optical digital diagnostics alarm threshold exceeded.Severity: Minor.Explanation: An opt

Page 86

A-36McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 524Message: No AL_PA acquired.Severity: Information

Page 87

Event Code TablesA-37Event Code TablesEvent Code: 581Message: Implicit incident.Severity: Major.Explanation: An attached server recognized a condition

Page 88

A-38McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesEvent Code: 583Message: Loss of signal or loss of synchronizati

Page 89

Event Code TablesA-39Event Code TablesEvent Code: 585Message: Primitive sequence timeout.Severity: Major.Explanation: An attached server recognized ei

Page 90

xviiiMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualPrefaceKorean MIC Mark The Korean Ministry of Information and Communications ma

Page 91

A-40McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code TablesThermal Sensor Events (800 through 899)Event Code: 810Message:

Page 92

Event Code TablesA-41Event Code TablesEvent Code: 812Message: CTP card shutdown due to thermal violations.Severity: Major.Explanation: The CTP card fa

Page 93

A-42McDATA Sphereon 4300 Fabric Switch Installation and Service ManualEvent Code Tables

Page 94

IndexI-1AAC power receptacle, location 1-3attention statements xviiiBback up switch configuration file 4-24BB_Creditconfigure 2-15description 2-1

Page 95

McDATA Sphereon 4300 Fabric Switch Installation and Service ManualI-2IndexDdanger statements xviiidata collection procedure 4-18date (set switch dat

Page 96

I-3IndexIndexMAP 0500 - Port failure or link incident analysis 3-16MAP 0600 - Fabric or ISL problem analysis 3-27summary 3-2fenced E_Portdescriptio

Page 97

McDATA Sphereon 4300 Fabric Switch Installation and Service ManualI-4IndexLEDsERR 1-5port status 1-5power supply status 1-5PWR 1-5link incident lo

Page 98 - Byte 4 Port Fence Code Action

I-5IndexIndexpower supplydescription 1-4fault isolation 3-9status LED 1-5power-off procedure 4-3power-on procedure 4-2precautionsESD xxigeneral

Page 99

McDATA Sphereon 4300 Fabric Switch Installation and Service ManualI-6IndexSphereon 4300 Fabric Switchdescription 1-1FRU removal and replacement 5-1F

Page 100

PrefacexixPreface• Portuguese.•Spanish (European).• Spanish (Latin American).DANGERUse the supplied power cords. Ensure the facility power receptacle

Page 101

McDATA Sphereon 4300 Fabric Switch Installation and Service ManualiiRecord of Revisions and UpdatesCopyright © 2002, 2005 McDATA Corporation. All righ

Page 102

xxMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualPrefacePERICOLOUsare il cavo di alimentazione in dotazione. Assicurarsi che la pre

Page 103 - Procedural Notes

PrefacexxiPrefaceThe following ATTENTION statements appear in this publication and describe practices that must be observed while installing or servic

Page 104 - Power On Switch

xxiiMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualPreface

Page 105 - IML or Reset Switch

General Information1-11General InformationThe McDATA® Sphereon™ 4300 Fabric Switch provides 12 ports of low-cost and high-performance dynamic Fibre Ch

Page 106 - Clean Fiber-Optic Components

11-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualGeneral Information• Expansion ports (E_Ports) to provide interswitch link (ISL)

Page 107

1General Information1-3General InformationFigure 1-2 illustrates the rear of the switch and shows the:1. AC power receptacle.2. RS-232 maintenance por

Page 108 - McDATA Filecenter Home Page

11-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualGeneral InformationThe switch also provides a predictive optics monitoring (POM)

Page 109

1General Information1-5General Information• Ethernet LAN interface, causing the connection to the management server to drop momentarily until the conn

Page 110 - Port LED Diagnostics

11-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualGeneral InformationMaintenance PortThe rear panel has a 9-pin DSUB maintenance p

Page 111 - Information

1General Information1-7General InformationStorage and ShippingEnvironmentProtective packaging must be provided to protect the switch under all shippin

Page 112

ContentsiiiPreface ...xiChap

Page 113

11-8McDATA Sphereon 4300 Fabric Switch Installation and Service ManualGeneral Information• Event information displays at a browser-capable PC communic

Page 114 - Diagnostics

1General Information1-9General Information• A modular design that enables quick removal and replacement of FRUs without the use of tools or equipment.

Page 115

11-10McDATA Sphereon 4300 Fabric Switch Installation and Service ManualGeneral InformationTools Supplied with the ProductThe following tools are suppl

Page 116

1General Information1-11General Information• Null modem cable - An asynchronous RS-232 null modem cable (Figure 1-6) is required to configure product

Page 117

11-12McDATA Sphereon 4300 Fabric Switch Installation and Service ManualGeneral Information— RS-232 serial communication software (such as ProComm Plus

Page 118 - Diagnostics View

Installation Tasks2-12Installation TasksThis chapter describes tasks to install, configure, and verify operation of the Sphereon 4300 Fabric Switch us

Page 119

22-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksSummary of Installation TasksTable 2-2 summarizes installation

Page 120 - Maintenance Data

2Installation Tasks2-3Installation Tasks• Support is available for a browser-capable PC and Internet connectivity to support the product-resident EFCM

Page 121 - Set Online State

22-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksDesktop InstallationTo install a switch on a desktop:1. Remove

Page 122 - Block or Unblock a

2Installation Tasks2-5Installation TasksRack-Mount InstallationPerform the following steps to install and configure the switch in a Fabricenter cabine

Page 123 - Upgrade Firmware

McDATA Sphereon 4300 Fabric Switch Installation and Service ManualivContentsTask 2: Unpack, Inspect, and Install the Product...2

Page 124 - Firmware Upgrade View

22-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksTask 3: Configure Product at the EFCM Basic Edition InterfaceP

Page 125 - Configuration Data

2Installation Tasks2-7Installation TasksFigure 2-1 Hardware ViewConfigure Product IdentificationPerform this procedure to configure the product identi

Page 126 - Backup Configuration View

22-8McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasksa. Type a unique product name of 24 alphanumeric characters or

Page 127 - Restore Configuration View

2Installation Tasks2-9Installation Tasksb. Click Time fields that require change, and type numbers in the following ranges:•Hour (HH): 0 through 23.•M

Page 128

22-10McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasksb. At the Rerouting Delay field, check (enable) or uncheck (d

Page 129

2Installation Tasks2-11Installation TasksConfigure Fabric ParametersPerform this procedure to configure fabric operating parameters.1. Set the product

Page 130 - Field-Replaceable Units

22-12McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksPrincipal is the highest priority setting, Default is next, a

Page 131

2Installation Tasks2-13Installation TasksFigure 2-6 Network View2. Click OK to save and activate changes. An acknowledgement message displays, indicat

Page 132

22-14McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasks5. At the PC, launch the browser application (Netscape Naviga

Page 133

2Installation Tasks2-15Installation Tasksc. Click the check box in the FAN column to enable or disable the fabric address notification (FAN) feature

Page 134

vContentsContentsIML or Reset Switch...4-3IML...

Page 135 - Breakdown

22-16McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksConfigure Port NPIVNPIV allows multiple (up to 256) Fibre Cha

Page 136 - Front-Accessible FRUs

2Installation Tasks2-17Installation Tasksa. Click Enable to activate the installed SNMP agent.b. Select the appropriate Fibre Alliance management info

Page 137 - Miscellaneous Parts

22-18McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksFigure 2-9 CLI ViewEnable or Disable Host ControlPerform this

Page 138 - Power Cords and Receptacles

2Installation Tasks2-19Installation Tasks3. Click (check) the Enable Host Control check box to activate host control of the product.4. Click OK to sav

Page 139 - Illustrated Parts Breakdown

22-20McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasks3. Software SSL enables use of an application program interfa

Page 140

2Installation Tasks2-21Installation TasksKeys are encoded to work only with the serial number of the installed product. Record the key to re-install t

Page 141

22-22McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation TasksFeature status is indicated by a green check markD(installed)

Page 142 - Event Code Tables

2Installation Tasks2-23Installation TasksTask 4: Configure Product Network Information (Optional)The product is delivered with default network address

Page 143

22-24McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasks4. At the Windows Workstation menu, sequentially select the P

Page 144

2Installation Tasks2-25Installation Tasks8. At the > prompt, type the user password (default is password) and press Enter. The password is case sen

Page 145

McDATA Sphereon 4300 Fabric Switch Installation and Service ManualviContents

Page 146

22-26McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasks15. Connect the product to the customer-supplied Ethernet LAN

Page 147

2Installation Tasks2-27Installation Tasks• Zone set - A zone set is a group of zones that is activated or deactivated as a single entity across all ma

Page 148

22-28McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasks4. Route a multimode or singlemode fiber-optic cable (dependi

Page 149

2Installation Tasks2-29Installation Tasks•Company.•Title.• Telephone and facsimile numbers.Figure 2-14 McDATA Filecenter Home Page3. Complete fields a

Page 150

22-30McDATA Sphereon 4300 Fabric Switch Installation and Service ManualInstallation Tasks

Page 151

Maintenance Analysis Procedures3-13Maintenance AnalysisProceduresThis chapter describes maintenance analysis procedures (MAPs) used by service represe

Page 152

3-2McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis ProceduresQuick StartTable 3-2 lists and summarizes MAPs. Fa

Page 153

Maintenance Analysis Procedures3-3Maintenence Analysis Procedures071 Switch is isolated. Go to MAP 0600.072 E_Port connected to unsupported switch. Go

Page 154

3-4McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures410 Switch reset. No action required.411 Firmware

Page 155

Maintenance Analysis Procedures3-5Maintenence Analysis ProceduresMAP 0000: Start MAPThis MAP describes initial fault isolation beginning at the:•Faile

Page 156

Figuresvii1-1 Sphereon 4300 Switch (Front View) ... 1-21-2 Sphereon 4300 Switch (Rear View) .

Page 157

3-6McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures2Ensure the product is connected to facility power

Page 158

Maintenance Analysis Procedures3-7Maintenence Analysis Procedures↓ Go to step 7.6Inspect the management interface for communication link failure. Obse

Page 159

3-8McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures8A link incident may have occurred, but the LIN al

Page 160

Maintenance Analysis Procedures3-9Maintenence Analysis Procedures10Inspect the Event Log to obtain failure reason codes:a. Select Event from the Logs

Page 161

3-10McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures2The power supply may be disconnected or failed.

Page 162

Maintenance Analysis Procedures3-11Maintenence Analysis Proceduresb. Byte 0 specifies failed FRU. Byte 1 specifies the slot number of the failed FRU (

Page 163

3-12McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures2Ensure the product is connected to facility powe

Page 164

Maintenance Analysis Procedures3-13Maintenence Analysis Proceduresa. Using a Phillips screwdriver, remove the protective cap from the 9-pin maintenanc

Page 165

3-14McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Proceduresl. Click Yes. A second message box appears. Click

Page 166

Maintenance Analysis Procedures3-15Maintenence Analysis Procedures2Visual inspection or event code 300, 301, or 302 indicates one or more cooling fans

Page 167

viiiMcDATA Sphereon 4300 Fabric Switch Installation and Service ManualFigures4-7 Basic Information View ...

Page 168

3-16McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures4As indicated by event code 426, an intermittent

Page 169

Maintenance Analysis Procedures3-17Maintenence Analysis Procedures1Ta bl e 3-7 lists event codes, explanations, and MAP steps.Ta bl e 3-8 lists link

Page 170

3-18McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures2As indicated by event code 080, the eight-byte (

Page 171

Maintenance Analysis Procedures3-19Maintenence Analysis Procedures4A connection is not allowed because of a conflict with the configured port type. An

Page 172

3-20McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis ProceduresWas the maintenance action successful?NO YES↓ The

Page 173

Maintenance Analysis Procedures3-21Maintenence Analysis Procedures6A loopback (wrap) plug is connected to the port with no diagnostic running. Remove

Page 174

3-22McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures9Inspect and service host bus adapters (HBAs).Was

Page 175

Maintenance Analysis Procedures3-23Maintenence Analysis Procedures12A connection is not allowed because of a SANtegrity authentication failure. At the

Page 176

3-24McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis ProceduresChange the port speed to be compatible with the b

Page 177

Maintenance Analysis Procedures3-25Maintenence Analysis Procedures17As indicated by event code 507, a port failed a loopback test. Reset the failed po

Page 178

Tablesix2-1 Factory-Set Defaults (Product) ... 2-12-2 Installation Task Summary ...

Page 179

3-26McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Proceduresd. Unblock the port. Refer to Block or Unblock a

Page 180

Maintenance Analysis Procedures3-27Maintenence Analysis ProceduresWas the maintenance action successful?NO YES↓ The product port is operational. Exit

Page 181

3-28McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures2A minor error occurred that caused the Fabric Se

Page 182

Maintenance Analysis Procedures3-29Maintenence Analysis ProceduresWas the maintenance action successful?NO YES↓ The fabric, ISL, and product are opera

Page 183

3-30McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Procedures8An E_Port segmented because the error detect tim

Page 184

Maintenance Analysis Procedures3-31Maintenence Analysis Procedures9An E_Port segmented because two fabric elements had duplicate domain IDs.a. Determi

Page 185

3-32McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Proceduresb. At the EFCM Basic Edition interface, inspect n

Page 186

Maintenance Analysis Procedures3-33Maintenence Analysis Proceduresd. At the Switch Priority field, select Principal, Never Principal, or Default, then

Page 187

3-34McDATA Sphereon 4300 Fabric Switch Installation and Service ManualMaintenence Analysis Proceduresa. At the Event Log, examine the first five bytes

Page 188

Maintenance Analysis Procedures3-35Maintenence Analysis Procedures• Disconnect the ISL. Exit MAP.• Refer to the manufacturer’s documentation and perfo

Comments to this Manuals

No comments